What are you looking for?
228 hits in Audits and investigation reports
Filters
Subjects
Type
Operator
Facility
Year
Selected filters
-
BP - Ula - Investigation of hydrocarbon leakPublished:BP’s management system for activities on the NCS. Following the PSA’s earlier investigation of the fire on the Valhall PCP installation in 2011, operator BP was served with orders which included a review
- Investigation report
- Working environment
- Technical safety
- Process safety
- Structural safety
- Emergency preparedness
- BP
- Ula PP
-
Order to Equinor – Troll C – investigation of incident with gas cooler cracksPublished:(seawater). The outer shell has a specified thickness of 36 millimetres. The coolers are protected by fire insulation on tank and flanges. Technical material investigations have concluded that the cracks were
- Investigation report
- Structural safety
- Process safety
- Maintenance management
- Equinor
- Troll C
-
Order for Rowan – Rowan Viking – electrical facilities, safety instrumented systems, technical safety and drilling-related systemsPublished:Non-conformity handling, manning and competence Ignition source control Overpressure protection Passive fire protection Firefighting Emergency power facility Emergency lighting Risk assessment of evacuation
- Inspection report
- Electrical installations
- Technical safety
- Well integrity
- Rowan
- Rowan Viking
-
AoC audit - AKOFS - AKOFS Seafarer - Electrical facilities, technical safety and maintenance managementPublished:Project execution and completion Barrier management Ignition source control Emergency lighting Passive fire protection Electrotechnical system analyses Work on and operation of electrical installations Training
- Inspection report
- Electrical installations
- Process safety
- Maintenance management
- AKOFS Seafarer
-
Equinor – Snorre B – Flexible risers and associated safety systemPublished:non-conformities were identified, relating to: Assessment of the consequences of the worst credible process fire Planning and prioritisation of observations in the TIMP tool Operation of flexible risers Systematic
- Inspection report
- Structural safety
- Process safety
- Equinor
- Snorre B
-
AoC audit – Noble Drilling – Noble Lloyd Noble – emergency preparedness, helideck and drinking waterPublished:drills Marking and signage of escape routes Life jacket design and location Immersion suits MOB suits Fire stations Marking of lifeboats Marking of FRC/MOB Maintenance of the drinking water system Piping and
- Inspection report
- Emergency preparedness
- Shelf Drilling Barsk
- Noble Drilling
-
Equinor – Martin Linge – completion and preparation for operationPublished:improvement points included: High failure rate of emergency lights Fault in self-closing doors in fire divisions What happens now? We have asked Equinor to report by 27 August 2021 on how the non-conformities
- Inspection report
- Process safety
- Technical safety
- Electrical installations
- Martin Linge
- Equinor
-
Equinor – Troll B – Technical safety, process safety and electrical facilitiesPublished:Deficiencies in operating and control equipment for motors and other consumers Deficiencies in passive fire protection of hydrocarbon-carrying equipment Inadequate illumination in emergency hospital Deficiencies
- Inspection report
- Process safety
- Technical safety
- Electrical installations
- Troll B
- Equinor
-
Songa Offshore - Songa Dee - Electrical plant and the roles responsibilities and duties of the personnel responsible for thisPublished:lighting Electrical plant – technical conditions Performance of modifications Frost protection of fire mains Improvement points were identified in connection with: Maintenance management Emergency shutdown
- Inspection report
- Process safety
- Songa
- Songa Deee
-
Gassco/Norske Shell – Nyhamna – emergency preparednessPublished:routines for handling personal protective equipment and the clarification of dirty and clean zones at the fire station What happens now? We have asked Gassco to report to us by 17 January 2025 on how the non-conformities
- Inspection report
- Emergency preparedness
- Gassco
- Nyhamna
- Shell
-
Gassco - Kårstø - Investigation into gas leakPublished:possible ignition of the gas leak, where parts of a gas-transporting pipe could have been exposed to jet fire and heat radiation. If personnel had been in the proximity of the leak in the event of ignition, this
- Investigation report
- Emergency preparedness
- Structural safety
- Process safety
- Gassco
- Kårstø
- Kvitebjørn
-
Total - Martin Linge - Technical safety Electrical facilities and Maintenance managementPublished:improvement points were identified in relation to: Response time for deluge Design report for active fire-extinguishing systems Test procedures for emergency lighting Marking of plant, systems and equipment
- Inspection report
- Technical safety
- Electrical installations
- Maintenance management
- Barrier management
- Total E&P Norge
- Martin Linge
-
AoC audit – Odfjell Drilling – Deepsea Yantai – emergency preparedness, the helideck and drinking waterPublished:suits Securing of escape route Escape from lift Corridors and passages Illumination of escape route Fire doors in living quarters In addition, an improvement point was identified relating to emergency response
- Inspection report
- Emergency preparedness
- Deepsea Yantai
- Odfjell Drilling AS
-
Repsol/Maersk Drilling – Yme – electrical facilities, safety instrumented systems, process safety and technical safetyPublished:facilities Electrical safety during completion Weaknesses in safety systems Non-conformity handling Passive fire protection We also identified improvement points relating to the following systems and areas: Competence
- Inspection report
- Electrical installations
- Process safety
- Technical safety
- Repsol
- Maersk Inspirer
-
Repsol - Gyda - Electrical installations, safety instrumented systems and maintenance managementPublished:operation of electrical facilities. We also observed improvement points linked to emergency lighting, fire and gas detection, maintenance management and barrier management. We have asked Repsol to report to
- Inspection report
- Electrical installations
- Technical safety
- Maintenance management
- Gyda
- Repsol
-
Rowan – Rowan Stavanger – management of emergency preparedness and helideck operationsPublished:identified 14 non-conformities in respect of the helideck. These comprised: Lack of procedure for sampling fire water/foam mixture Failure to monitor degradation of safety netting/perimeter netting attachment Some
- Inspection report
- Emergency preparedness
- Risk management
- Rowan Stavanger
- Rowan
-
Order to Equinor following audit of Martin Linge APublished:non-conformities. The improvement points concerned start-up arrangements for emergency generators and fire pumps, training and drills and overpressure protection. In addition, we found a non-conformity from
- Inspection report
- Electrical installations
- Process safety
- Technical safety
- Equinor
- Martin Linge
-
Order to Vår Energi - GoliatPublished:related to fire dampers (see item 5.1.1 in the audit report). Nonconformities and improvement points The audit identified nonconformities in the following areas (numbers refer to the report): fire dampers
- Inspection report
- Electrical installations
- Goliat FPSO
- Vår Energi
- Eni Norge
-
Equinor – Heimdal – investigation of work accidentPublished:occurred while filling (pressurising) a 3.4-litre nitrogen gas cylinder, which formed part of the fire extinguishing system on the platform and was to be pressurised to 200 barg using a booster pump. During
- Investigation report
- Working environment
- Process safety
- Emergency preparedness
- Heimdal
- Equinor
-
Order to Equinor – Norne – technical safety, electrical systems, automation and risk managementPublished:maintenance Deficient planning and prioritisation Defective follow-up of the alarm systems Passive fire protection Deficient labelling of facilities, systems and equipment We also observed one factor that
- Inspection report
- Barrier management
- Process safety
- Norne FPSO
- Equinor