What are you looking for?
250 hits in Audits and investigation reports
Filters
Subjects
Type
Operator
Facility
Year
Selected filters
-
Order to Aker BP – UlaPublished:cannot withstand the loads which could arise in the event of a liquid fire. To compensate for deficient and inadequate passive fire protection, a requirement has been in place since 2008 for Ula P to be
- Audit report
- Barrier management
- Maintenance management
- Risk management
- Aker BP
- Ula PP
-
Order for COSL Drilling – COSLPioneer – Electrical facilities, safety instrumented systems and technical safetyPublished:was issued with an Acknowledgement of Compliance on 17 June 2011. We have been informed that many fire dampers on the facility have been weakened for a long time. The weaknesses have been known to some
- Audit report
- Electrical installations
- Technical safety
- COSL Pioneer
- COSL Drilling Europe
-
Statoil - IT SecurityPublished:the industry's work to safeguard IT systems that manage processes, monitor potential gas leaks or fires and perform safe shutdowns for plant and facilities. In October 2016, the PSA became aware that maintenance
- Audit report
- Cyber security
- Statoil
-
Order for Seadrill - electrical facilities and technical safety on West BollstaPublished:competence Emergency power systems Ignition source control Ventilation systems Active fire protection Passive fire protection Open drainage system Maintenance system Winterisation Electrical facilities
- Audit report
- Electrical installations
- Technical safety
- West Bollsta
-
Equinor – Martin Linge – process safety and technical safetyPublished:in the follow-up of the maintenance programme for firefighting facilities Deficiencies in passive fire protection Follow-up of non-conformities During the audit, we also verified how Equinor has addressed
- Audit report
- Process safety
- Technical safety
- Equinor
- Martin Linge
-
AoC audit – Macro Offshore – Haven – emergency preparedness and helideckPublished:the helideck on Haven. Result We identified six non-conformities during the audit. These concerned: Fire stations Marking of escape routes Training of the emergency response organisation on board Anti-slip
- Audit report
- Emergency preparedness
- Haven
-
Eni Norge - Goliat - Electrical installationsPublished:identified in connection with: Gas detectors of HVAC intakes and ducts Organisation of electrical staff Fire detectors and manual activation of electrical isolation Test method for heating cables Personnel responsible
- Audit report
- Electrical installations
- Process safety
- Eni Norge
- Goliat FPSO
-
Premier Oil and the Bream developmentPublished:Result During the audit, an observation was made concerning the robustness of the proposed solution for fire water, which the PSA considers may present a challenge in terms of satisfying regulatory requirements
- Audit report
- Process safety
- Premier Oil
-
Aker BP - Ula - Emergency preparedness and helideckPublished:addition, improvement points were identified relating to: Verification of performance requirements Fire stations Lifeboats Safety assessments relating to maintenance and modification Working arrangements
- Audit report
- Emergency preparedness
- Aker BP
- Ula PP
-
AoC audit – Noble Drilling – Noble Lloyd Noble – electrical facilities and technical safetyPublished:decoupling Ventilation system Emergency lighting Active firefighting Open drainage system Passive fire protection Risk analyses and heat loads Electrotechnical system analyses Electrical facilities – technical
- Audit report
- Process safety
- Electrical installations
- Technical safety
- Noble Drilling
- Shelf Drilling Barsk
-
Equinor – Oseberg H – use of vessel with gangwayPublished:requirements of the Offshore Operation Manager, activation of emergency shutdown of Oseberg H, assessment of fire on the gangway-equipped vessel and competency requirements of gangway operators. What happens now
- Audit report
- Working environment
- Emergency preparedness
- Process safety
- Structural safety
- Oseberg H
- Equinor
-
Dolphin & Wintershall - Borgland Dolphin - Emergency preparedness & Working environmentPublished:information for 3rd-party OHSs Verification of measures Securing of loose equipment in normal operations Fire stations. The improvement points concern: Working environment competence offshore Illumination of
- Audit report
- Working environment
- Emergency preparedness
- Dolphin
- Borgland Dolphin
-
Point Resources - Jotun A - Risk, barrier and maintenance managementPublished:documentation of the impact of automatic water deluge in the event of confirmed gas detection, penetrations in fire walls, the emergency shutdown system, and planning and prioritisation. We have asked Point Resources
- Audit report
- Risk management
- Maintenance management
- Barrier management
- Point Resources
- Jotun A
-
Eni Norge AS - Goliat FPSO - Management of emergency preparednessPublished:In addition, improvement points were observed concerning the use of lifting equipment, scaffolding, fire team radio communication, alternative mustering station for response teams and changes to emergency
- Audit report
- Emergency preparedness
- Eni Norge
- Goliat FPSO
-
Vår Energi – Major accident risk and barriers – BalderPublished:Barrier strategy and performance standards Management of change Process safety Ignition source control Fire resistance Temporary equipment and installations Labelling Maintenance programme Documentation Deck
- Audit report
- Barrier management
- Risk management
- Balder
- Vår Energi
-
Statoil - Statfjord A - Elektro, sikkerhetssystemer og teknisk sikkerhetPublished:Assumptions in the risk analysis Labelling of equipment Insulating mats in front of electrical panels Fire insulation Maintenance of deluge systems Non-conformity: Entails that a condition is assessed as not
- Audit report
- Electrical installations
- Technical safety
- Statoil
- Statfjord A
-
Odfjell – Deepsea Atlantic – risk management, electrical facilities and safety instrumented systemsPublished:management Handling of non-conformities Ignition source control Ventilation system Firefighting Passive fire protection Open drainage Emergency lighting Lithium ion battery system Electrical facilities and installations
- Audit report
- Process safety
- Risk management
- Electrical installations
- Technical safety
- Deepsea Atlantic
- Odfjell Drilling AS
-
Statoil - Statfjord C - Investigation of hydrocarbon leakPublished:started up. The valve controlling the level in the oily water tank failed to open, and oil escaped via fire seals on the cellar deck. Consequences Statoil calculated that up to 42 cubic metres of stabilised
- Investigation report
- Working environment
- Emergency preparedness
- Technical safety
- Maintenance management
- Statfjord C
- Statoil
-
Statoil - Heimdal - Investigation of a hydrocarbon leakPublished:expertise and risk understanding. Potential In addition, inadequate capacity in the fire water system and in the fire wall between the production and drilling areas was identified. These conclusions are
- Investigation report
- Emergency preparedness
- Working environment
- Process safety
- Statoil
- Heimdal
-
BP - Ula - Investigation of hydrocarbon leakPublished:BP’s management system for activities on the NCS. Following the PSA’s earlier investigation of the fire on the Valhall PCP installation in 2011, operator BP was served with orders which included a review
- Investigation report
- Working environment
- Technical safety
- Process safety
- Structural safety
- Emergency preparedness
- BP
- Ula PP