§ 62 Stability
Floating facilities and vessels with an offshore gangway to simpler facilities shall have buoyancy and stability in intact and damaged condition.
The facilities shall withstand filling of at least one watertight room against the sea, a room that is wholly or partly below the water line, or rooms that contain piping systems connected to the sea. Moreover, the facility shall withstand collision damage on at least one watertight bulkhead in exposed areas. Semi-submersible facilities shall have reserve buoyancy in the deck.
Piping systems within the collision area shall be regarded as damaged.
There shall be weight control systems on floating facilities, which ensure that the weight, weight distribution and centre of gravity are within the design specifications. Equipment and structure sections shall be secured against displacement that can influence stability.
Section last changed:
01 January 2016