Consents
Operators must obtain consent from the regulator at important milestones.
Learn more about consents
Sorted by:
Most recently published
-
Repsol - Removal of Petrojarl VargPublished:Repsol has received consent for the removal of Petrojarl Varg and subsea structures on the Varg field.
- Removal phase
-
ConocoPhillips - Lifetime extension for EldfiskPublished:ConocoPhillips has received consent to extend the lifetime of facilities and pipelines on the Eldfisk field.
- Lifespan
-
Statoil - Modifications at Kristin and TyrihansPublished:Statoil has received consent for modifications at Kristin and Tyrihans in connection with tie-in of the Maria field.
- Operations, maintenance, modifications
-
Statoil - Use of Edvard Grieg oil pipelinePublished:The Petroleum Safety Authority Norway has given Statoil consent to use the Edvard Grieg Oil Pipeline (EGOP)
- Pipelines
- Use of facility
-
Gassco AS receives consent to use the Utsira High gas pipelinePublished:
- Pipelines
- Use of facility
-
Statoil - Extended lifetime for Oseberg CPublished:Statoil has received consent to extend use of Oseberg C and associated pipelines to March 2031.
- Lifespan
-
Statoil - Use of pipelines and subsea production facilities on the Åsgard fieldPublished:Statoil has received consent to use pipelines and subsea production facilities on the Åsgard field.
- Pipelines
- Use of facility
-
Statoil - Use of pipelines and subsea production facilities at Gullfaks SørPublished:Statoil has received consent to use pipelines and subsea production facilities at Gullfaks Sør.
- Pipelines
- Use of facility
-
ExxonMobil - Extended lifetime for Jotun A and Jotun BPublished:ExxonMobil Exploration and Production Norway AS (ExxonMobil) has received consent to use Jotun A and Jotun B beyond the originally planned lifetime.
- Lifespan
-
BP Limited use of Valhall QP beyond its original operating lifePublished:BP has received consent for limited use of the Valhall QP accommodation facility beyond its original operating life.
- Lifespan