Consents
Operators must obtain consent from the regulator at important milestones.
Learn more about consents
Sorted by:
Most recently published
-
Equinor - consent to use gas export facilityPublished:Equinor has been given consent to use the gas export solution from Troll B to the Kvitebjørn gas pipeline.
- Use of facility
-
Equinor – consent for modifications – Sture terminalPublished:The Norwegian Ocean Industry Authority (Havtil) has given Equinor consent to make major modifications at the Sture terminal.
-
Equinor - consent to use VerdandePublished:The Norwegian Ocean Industry Authority (Havtil) has given Equinor consent for startup and use of facility Verdande at the Norne field.
- Use of facility
-
Equinor consent to use Deepsea BollstaPublished:Norwegian Ocean Industry Authority (Havtil) has given Equinor consent to use the Deepsea Bollsta facility for plugging, drilling and completion of wells on the Visund Sør field.
- Production drilling
-
Equinor – consent for exploration drilling in the Norwegian SeaPublished:The Norwegian Ocean Industry Authority (Havtil) has granted Equinor consent for exploration drilling in block 6407/1 in the Norwegian Sea.
- Exploration drilling
-
Vår Energi – consent for exploration drilling in the Barents SeaPublished:The Norwegian Ocean Industry Authority (Havtil) has granted Vår Energi consent for exploration drilling in block 7122/8 in the Barents Sea.
- Exploration drilling
-
Equinor – consent for exploration drilling in the North SeaPublished:The Norwegian Ocean Industry Authority (Havtil) has granted Equinor consent for exploration drilling in block 34/6 in the North Sea.
- Exploration drilling
-
Equinor – consent for exploration drilling in the North SeaPublished:The Norwegian Ocean Industry Authority (Havtil) has granted Equinor consent for exploration drilling in block 34/4 in the North Sea.
- Exploration drilling
-
Equinor - consent to use Deepsea BollstaPublished:Norwegian Ocean Industry Authority (Havtil) has given Equinor consent to use the Deepsea Bollsta facility for permanent plugging and abandonment of wells on the Troll field.
- Use of facility
-
Equinor – consent to use Island ConstructorPublished:The Norwegian Ocean Industry Authority (Havtil) has given Equinor consent to use the Island Constructor facility for well intervention activities in several fields/production licenses.
- Use of facility