Operator: TotalEnergies EP Norge AS
Fields: Skirne and Atla
Facility: West Elara
Atla
Atla is a field located in the central part of the North Sea, 20 kilometres northeast of the Heimdal field. The water depth is 119 metres. Atla was discovered in 2010, and the plan for development and operation (PDO) was approved in 2011. The field has been developed with one production well which is connected to a subsea facility, and is tied-back to Heimdal via the Skirne field. Production started in 2012.
Atla was shut down in June 2023, and decommissioning is ongoing.
Source: norskpetroleum.no
Skirne
Skirne, including the Byggve deposit, is a field in the central part of the North Sea, 20 kilometres east of the Heimdal field. The water depth in the area is 120 metres. Skirne was discovered in 1990, and the plan for development and operation (PDO) was approved in 2002. The field has been developed with two subsea templates tied to the Heimdal facility. Production started in 2004 and ceased in 2023. Decomissioning is ongoing.
Source: norskpetroleum.no