Operator: Gassco

Field: Draupner

Facility: Macro Haven

Additional information: The use of Haven as a flotel is part of the Draupner robustness project.

Draupner

The Draupner S and Draupner E facilities are part of the gas transport pipeline network on the Norwegian Continental Shelf. Gassco is the operator and uses Equinor as the technical services provider (TSP). The Draupner S facility was put into service in April 1985, as part of the Statpipe system. The Draupner E facility was installed in 1994 as part of the Europipe I pipeline from the Sleipner field to Emden in Germany.