The processing facility is the third of four facilities to be installed on the Johan Sverdrup field in the first phase of field development (phase 1).

The various facilities and installations in phase 1 will be prepared and finalised for use in the period Q2 2018 to Q4 2019.

Production start-up for Johan Sverrup is scheduled for Q4 2019.