The consent covers the drilling of eight production wells in connection with the development of Troll phase 3 on the Troll field in the North Sea.
Drilling is scheduled to begin in September 2019 and expected to last 144 days.
COSLPromoter is a semi-submersible, dynamically positioned, drilling facility of the GM4000 type. The facility is owned and operated by COSL Drilling Europe, and received an Acknowledgement of Compliance (AoC) from the PSA in 2012.