The consent applies to the drilling of production wells in production licence 435 on the Dvalin field.

Drilling is scheduled to begin in August 2019 and is expected to last 352 days.

Dvalin

Dvalin is a field in the central part of the Norwegian Sea and consists of two separate structures, Dvalin East and Dvalin West. Dvalin East was proven in 2010 and is located 15 kilometres northwest of the Heidrun field. The water depth is 344 metres. Dvalin West was proven in 2012 and is located 3.5 kilometres west of Dvalin East. The water depth is 400 metres. The plan for development and production (PDO) was approved in March 2017. The development concept is a subsea template with four gas producers tied-back to the Heidrun platform.

Production started in 2020. PDO for Dvalin North was approved in June 2023, and includes a subsea template with three production wells. Dvalin North is under development and is planned to start production in 2026.

Source: norskpetroleum.no