The consent concerns use of the Maersk Integrator mobile drilling facility to drill production wells 15/6-B-9 and 15/6-B-19.

The drilling operations are expected to last a total of 101 days.

Maersk Integrator is a jack-up drilling facility, delivered by the Keppel Shipyard in Singapore in 2014. The facility will be operated by Maersk Drilling Norge AS. 
Maersk Integrator was issued with an Acknowledgement of Compliance (AOC) by the PSA in June 2015.

Gina Krog

Gina Krog is a field on the Utsira High in the central part of the North Sea, just north of the Sleipner Vest field. The water depth in the area is 110-120 metres. Gina Krog was discovered in 1978, and the plan for development and operation (PDO) was approved in 2013. The field is developed with a fixed platform with living quarters and processing facilities. Drilling is performed by a mobile jack-up rig. Production started in 2017.

Source: norskpetroleum.no