The consent applies to modification of existing hydrotreating plant that will lead to a reduction in sulphur in gasoline delivered from Mongstad. In addition, the flow rate will increase from 95 to 115 t/h.
We have now granted consent for the modification of existing hydrotreating plant A-1300 at Mongstad in accordance with Equinor's application.