The audit was conducted on 12 and 13 February 2026.
Objective
The objective of the audit was to verify that the Alvheim FPSO’s structural integrity was being safeguarded in compliance with the HSE regulations.
Result
One non-conformity was identified relating to overutilisation in the bow section of the Alvheim FPSO.
What happens next?
We have asked Aker BP to report to us by 8 April 2026 on how the non-conformity will be addressed.