The audit was conducted from 15 to 22 August 2025.

Objective

The objective of the audit was to verify that Vår Energi’s management of materials handling and work at height complied with the company’s own and the authorities’ requirements, so as to reduce the likelihood of failures. An expected outcome may be a reduction in incidents, made visible through better RNNP results.

Result

We identified two non-conformities during the audit. These concerned:

  • Compliance with own management system
  • Scaffolding deficiencies

What happens next?

We have asked Vår Energi to report to us by 1 December 2025 on how the non-conformities will be addressed.