The audit was conducted on 27 March 2025.

Objective

The objective of the audit was to clarify whether the requirements in the HSE regulations concerning structural safety are being met in planned operations at Eldfisk.

Result

Two non-conformities were identified, concerning:

  • Collision energy
  • Monitoring of erosion

What happens now?

We have asked COPSAS to report by 10 June 2025 on how the non-conformities will be addressed.