The audit was conducted from 2 to 5 June 2025.

Objective

The objective of the audit was to verify that Aker BP’s management of materials handling and work at height complied with the company’s own and the authorities’ requirements, so as to reduce the likelihood of failures.

Result

We identified four non-conformities during the audit. These concerned:

  • Maintenance programme for lifting equipment
  • The MOB boat forerunners were not designed in accordance with requirements
  • Follow-up of scaffold management systems
  • Follow-up of loose lifting equipment

We also identified an improvement point concerning the management system.

What happens next?

We have asked Aker BP to report to us by 30 September 2025 on how the non-conformities will be addressed and for their assessment of the improvement point observed.