The audit was conducted on 3 and 4 June 2024.

Objective

The objective of the audit to examine through spot checks how the rig owner handles follow-up of structural issues, particularly related to class renewal of the facility. We wanted to gain insights into how relevant testing, inspection and maintenance planning linked to structural issues are performed before and during the actual classification of the facility.

Result

One non-conformity was identified in connection with procedures.

What happens now?

We have asked Odfjell to report to us by 15 August 2024 on how the non-conformity will be addressed.