The audit was conducted on 7 May 2024.
Objective
The objective of the audit was to obtain an overview of the technical condition and integrity of the pipeline systems, and to verify that their operation complies with the requirements in the HSE regulations.
Result
We did not identify any non-conformities or improvement points in this audit.