Objective

The objective of the audit was to verify that the design engineering and fabrication of the subsea production system and wellheads comply with the company’s own and the regulatory requirements. We also wanted to verify that the project is fulfilling its supervisory duty in respect of the supplier.

Result

No non-conformities were observed during the audit.

The following improvement points were identified:

  • Wellhead design
  • Qualification of technology

What happens next?

Equinor has been given a deadline of 14 February 2020 to report on how the improvement points will be addressed.