Objective

The objective of the audit was to verify how the company is catering for the technical condition of load-bearing structures on the facility, which is being operated in accordance with a consent for use beyond its original operating life.

Result

No non-conformities were identified.

Two improvement points were identified in connection with:

  • Organisation of condition inspection
  • Use of a risk-based inspection program

What happens now?

Okea has been given a deadline of 7 June 2019 to report on how the improvement points will be addressed.