Objective

The objective of the audit was to examine how Statoil is maintaining the integrity of the main load-bearing structures of the operational facilities. The audit was conducted by examining whether the scope of inspections, methods and assessments of results complied with the regulations.

Result

No non-conformities were identified.

One improvement point was identified linked to methods for subsea inspections of load-bearing structures.

Statoil has been given a deadline of 20 February 2018 to report on how the improvement point will be addressed.