Objective

The objective of the audit was to verify, through spot checks, how Spirit Energy is monitoring the geotechnical and constructional conditions for Maersk Interceptor on the Oda field. We looked at how Spirit Energy specifies the site-specific conditions, and how the investigations and analyses are performed and verified. We placed particular emphasis on the geotechnical conditions and how it is being ensured that all regulatory requirements are being met.

Result

No non-conformities were identified.

Three improvement points were identified in connection with:

  • Documentation of the quality controls
  • Analyses of boat collisions
  • Traceability of decision-making

Spirit Energy has been given a deadline of 24 August 2018 to report on how the improvement points will be addressed.