The audit was conducted on 15 and 16 November 2018.

Objective

The objective of the audit was to verify that the design engineering of the subsea production system and Christmas tree comply with the company’s own and the regulatory requirements. There was a sub-objective of monitoring how the project is exercising its supervisory duty in respect of the supplier.

Result

The audit did not identify any non-conformities.

Three improvement points were identified in connection with:

  • System for detecting leaks – performance requirements
  • Risk reduction and continuous improvement
  • Instrumentation and monitoring

Equinor has been given a deadline of 25 January 2019 to report on how the improvement points will be addressed.