Objective 

The objective was to verify that the company's plans and decisions, in the phase between design and fabrication, ensure that work processes and solutions are utilised in the company's improvement work. And also to audit the company's sharing of experiences and realisation of HSE benefits.

Result

No non-conformities were identified.

An improvement point was identified in connection with electrical plant.   

Statoil has been given a deadline of 22 April 2016 to report on how the improvement point will be dealt with.

Johan Sverdrup

Johan Sverdrup is a field on the Utsira High in the central part of the North Sea, 65 kilometres northeast of the Sleipner fields. The water depth in the area is 110-120 metres. Johan Sverdrup was discovered in 2010 and the plan for development and operation (PDO) for Phase I was approved in 2015. The development solution for the first development phase is a field centre with four specialised platforms: living quarters, process, drilling and riser facilities. Production started in 2019.

The PDO for Phase II was approved in 2019. The development solution comprises a process platform and five subsea templates. Production from phase II started in 2022.