Objective 

The objective of the audit was to monitor that Det norske, in cooperation with the development project's stakeholders, was complying with the preconditions in the PDO, applicable regulations, standards and the company's own requirements.

Result

No non-conformities were identified during the audit.

Four improvement points were identified in connection with:

  • Performance requirements for barrier functions and elements
  • Class H firewall conduit penetrations
  • Cooling water system and control panel for the back-up diesel generator
  • Automatic fuses – status indication and locking device

Det norske has been given a deadline of 20 June 2016 to report on how the improvement points will be dealt with.