The objective of the audit was to verify that the integrity management of flexible risers and subsea facilities and associated safety equipment on land complies with the regulations and the company' own requirements.

Result

No non-conformities were identified.

Two improvement points were identified in connection with:

  • Documentation
  • Responsibilities

Statoil has been given a deadline of 28 August 2015 to report on how the improvement points will be dealt with.

Non-conformity:

Entails that a condition is assessed as not complying with a regulatory requirement.

Improvement point:

Entails that we have identified a deficiency or weakness, without there being sufficient grounds for determining a breach of regulatory requirements.