The objective of the audit was to verify that the risk of acute spills was being given sufficient attention and that regulatory requirements concerning technical, operational and organisational measures for risk management were being complied with.

Result

No non-conformities were detected during this audit.

An improvement point was identified in connection with internal requirements.

Statoil has been given a deadline of 30 October 2015 to report on how the improvement point will be dealt with.

Non-conformity:

Entails that a condition is assessed as not complying with a regulatory requirement.

Improvement point:

Entails that we have identified a deficiency or weakness, without there being sufficient grounds for determining a breach of regulatory requirements.