The audit was conducted on 12 and 13 October 2015.

Objective

The objective of the audit was to verify that Aasta Hansteen is being built in conformity with the regulatory requirements for materials handling, working environment and emergency preparedness.

Result

No non-conformities were identified during the audit.

One improvement point was identified, relating to materials handling.