The audit was conducted between 13 to 16 October 2015.
Objective
The objective of the audit was to verify compliance with the regulations and the preconditions for the granting of an AoC within the logistics domain.
Result
No non-conformities were identified during the audit.
Improvement points were identified relating to:
- Operationally responsible entity, deck manning and replacement of personnel
- Loading and storage decks
- Lifting equipment and enterprise of competence
- Cranes
- Engine room hatch
- Wire rope for cranes and competence
- PA speakers in crane cabins
What happens next?
We have asked Dolphin for an assessment of the improvement points identified.
The deadline for reply is set at 20 January 2016.