Objective

The objective of the activity was to verify that Statoil was catering for the requirements set out by the company and in statutory provisions.

Result

No non-conformities were identified.

Improvement points were identified in connection with:

  • Overpressure protection
  • Gas detection system
  • Depressurisation and potential for isolating the LPG installation
  • Fire monitors in the LPG installation
  • Fire protection
  • ESD valves
  • Performance requirements of barriers
  • A number of less serious observations linked to water leaks, frozen emergency shower and missing markings,among other things
  • Primary barriers for the sulphur facility