Objective
The objective of the activity was to verify that Statoil was catering for the requirements set out by the company and in statutory provisions.
Result
No non-conformities were identified.
Improvement points were identified in connection with:
- Overpressure protection
- Gas detection system
- Depressurisation and potential for isolating the LPG installation
- Fire monitors in the LPG installation
- Fire protection
- ESD valves
- Performance requirements of barriers
- A number of less serious observations linked to water leaks, frozen emergency shower and missing markings,among other things
- Primary barriers for the sulphur facility