Objective
The objective of the audit was to monitor that Eni, in cooperation with HHI and other stakeholders, was complying with the preconditions in the PDO, applicable regulations, standards and Eni's own requirements. The audit placed particular emphasis on the preparation, implementation and visibility of the the Goliat FPSO's specific barrier strategies, performance requirements and performance-influencing factors from a life-cycle perspective.
Result
No non-conformities were identified.
Improvement points were identified in connection with:
- Barrier management
- Fire-fighting strategy
- The need for and the role of the "Stop Blowdown" function
- The cooling water system for the emergency generator unit
- Ventilation in the cargo pump room
- Fire water supply
- Fire resistance and passive fire protection
- Fire insulation of the electrical panel room
- Safety-critical rooms and sensitive electrical equipment
- Ignition source control