What are you looking for?
431 hits in Complete website
Filters
Subjects
Year
Selected filters
-
Statoil - Gina Krog - Barrier managementPublished:identified in connection with: Fire design loads The fire water system In addition, improvement points were identified in connection with: Risk management Barrier management system Fire divisions Partitioning
- Audit report
- Barrier management
- Risk management
- Technical safety
- Process safety
- Statoil
- Gina Krog
-
Equinor – Snorre B – emergency preparedness and helideckPublished:210° obstacle-free approach and take-off sector Helideck data Friction arrangements on the helideck Fire extinguishing system on the helideck Missing anemometer We also observed three factors we have chosen
- Audit report
- Emergency preparedness
- Equinor
- Snorre B
-
Re § 24 Outdoor work areasaccumulation of flammable gases, hazard of increased explosion pressure and potentially reduced access for fire-fighting. With regard to new constructions and modifications, weather protection requirements should
- Guideline
- Technical and operational regulations
-
Equinor - Statfjord C - Follow-up of the preconditions for consent to expand the lifetimePublished:with: The fire water system Penetrations in fire walls Noise exposure Chemical health hazards In addition, improvement points were identified in connection with: Inspection of penetrations in fire walls Updating
- Audit report
- Working environment
- Process safety
- Statoil
- Statfjord C
-
Statoil - Valemon - Barrier management - Technical safety - Electrical installationsPublished:Heating cables Fire areas Fire divisions In addition, six improvement points were identified in connection with: Explosion overpressure Ignition source control Isolation plan Passive fire protection Documentation
- Audit report
- Electrical installations
- Technical safety
- Process safety
- Statoil
- Valemon
-
§ 3 Definitionsinstallations. Fire area: Area, building or room that is separated from other areas by a fire division, such that the likelihood of spread in the event of a design fire load is reduced. Fire division: Distance
- Paragraph
- Technical and operational regulations
-
Eni Norge - Goliat FPSO - Emergency preparednessPublished:Goliat field, located on the Tromsøflaket bank in the Barents Sea around 85 kilometres north-west of Hammerfest. The field will be developed using a floating production, storage and offloading (FPSO) vessel
- Audit report
- Emergency preparedness
- Eni Norge
- Goliat FPSO
-
§ 8 Structures and materialsSection 6, manufacturing, joining and construction processes, possible use of materials protection, fire resistance attributes, probable changes in operating conditions, the opportunity to reduce future
- Paragraph
- Technical and operational regulations
-
Statoil - Mongstad - Technical safetyPublished:detection system Depressurisation and potential for isolating the LPG installation Fire monitors in the LPG installation Fire protection ESD valves Performance requirements of barriers A number of less serious
- Audit report
- Technical safety
- Process safety
- Statoil
- Mongstad
-
GDF SUEZ - Gjøa - Barrier management, process safety, technical safety and electrical installationsPublished:in connection with the fire water system. In addition, improvement points were identified in connection with: • Governing documents • Risk analysis • Ignition source control • Fire resistance of deck grating
- Audit report
- Barrier management
- Process safety
- Technical safety
- Electrical installations
- Gjøa
- GDF Suez
-
BP - Valhall - Process safety and technical safetyPublished:improvement points were identified in connection with: The emergency shutdown system Passive fire protection Fire water triggering The maintenance system Safety systems
- Audit report
- Process safety
- Technical safety
- BP
- Valhall DP
-
Lundin - Edvard Grieg - Technical barriersPublished:Penetrations in fire walls Follow-up of performance requirements for check valves and safety-critical heating cables Three improvement points were identified in connection with: Passive fire protection Governing
- Audit report
- Barrier management
- Lundin
- Edvard Grieg
-
Lundin - Leiv Eriksson - Pressure drillingPublished:the operator for production licence 492, in the Barents Sea, around 185 kilometres north-west of Hammerfest. Lundin has previously received consent to drill exploration well 7120/1-5 in a prospect named
- Audit report
- Well integrity
- Lundin
- Leiv Eiriksson
-
Vår Energi – Balder FPU – emergency preparednessPublished:Failure to update drawings Missing arrangements for rapid and efficient evacuation Deficiencies at fire stations Incompatible emergency preparedness tasks We also observed one factor that we have chosen
- Audit report
- Emergency preparedness
- Balder
- Vår Energi
-
Saipem – Scarabeo 8 – electrical installations, safety instrumented systems and technical safetyPublished:Missing ignition source decoupling of non EX-rated equipment on deck. Deficiencies in fire dampers, fire walls and fire doors Governing documents not updated Lack of activities for monitoring performance
- Audit report
- Electrical installations
- Technical safety
- Saipem
- Scarabeo 8
-
ConocoPhillips - Eldfisk 2/7 S - Development projectPublished:Non-conformities were identified in connection with: The fire water system Fire design loads In addition, improvement points were identified in connection with: Fire design loads Instructions for operating emergency
- Audit report
- Barrier management
- Electrical installations
- Technical safety
- Process safety
- Risk management
- ConocoPhillips
- Eldfisk S
-
Neptune Energy – Gjøa – Technical barriers and follow-up of condensate leakPublished:June 2017. Result Non-conformities were identified relating to: The fire water system Procedure for fracture calculations Passive fire protection Updated analyses and assessments In addition, improvement
- Audit report
- Structural safety
- Process safety
- Barrier management
- Technical safety
- Neptune Energy
- Gjøa
-
Re § 3 Definitionsto definitions as listed in this section. Fire divisions – Classes A, B and H: The ISO 834 standard should be used for standardised fire tests. For class H fire divisions, the hydrocarbon curve described
- Guideline
- The facilities regulations
-
§ 19 Ventilation and indoor climatechange and provide acceptable air quality. The ventilation shall also be designed so that smoke from fires can be controlled, and so that hazardous and combustible gases cannot penetrate closed non-rated areas
- Paragraph
- Technical and operational regulations
-
§ 20 Chemicals and chemical exposurebe considered: health and safety of personnel, corrosion and other forms of material decomposition, fire and explosion hazard, and risk for pollution. 612-1033-F2025_1-20
- Paragraph
- Technical and operational regulations