Eni Norge - Use of Songa Enabler on the Goliat fieldPublished:field is in production licence 229 in blocks 7122/7 and 7122/10, around 85 kilometres northwest of Hammerfest. Drilling is scheduled to begin in late January 2018. The activity is expected to last for 116
- Consent
- Use of facility
-
Re § 3 Definitionsplant tank area pipe trenches flares control rooms manned buildings in general (workshop, laboratory, fire station, administration buildings) unmanned buildings (substations, analyser buildings, warehouses)
- Guideline
- Technical and operational regulations
-
§ 16 Drainage systemshall be equipped with drainage systems that can collect and divert liquids to reduce the risk of fire, harm to personnel and pollution. 612-1033-F2025_1-16
- Paragraph
- Technical and operational regulations
-
§ 29 Hazardous materials and explosivessubstances and explosives shall be marked, handled and stored so that the risk of and in connection with fire, explosion and other accidents is as small as possible. Hazardous substances and explosives shall
- Paragraph
- Technical and operational regulations
-
Eni - Goliat FPSO - Technical and operational barriersPublished:management Fire-fighting strategy The need for and the role of the "Stop Blowdown" function The cooling water system for the emergency generator unit Ventilation in the cargo pump room Fire water supply
- Inspection report
- Eni Norge
- Goliat FPSO
-
Equinor – Troll C – technical safety, process safety and electrical facilitiesPublished:out maintenance programme Deficiencies in fixed firefighting facilities Deficiencies in fire doors and passive fire protection We also identified four improvement points concerning: Documentation Marking
- Inspection report
- Process safety
- Electrical installations
- Technical safety
- Troll C
- Equinor
-
ConocoPhillips - Ekofisk - Corrosion under insulation (CUI)Published:Corrosion under insulation (CUI) From 20 August to 5 September 2018, we carried out an audit of passive fire protection, corrosion under insulation (CUI) including surface treatment and repairs under insulation
- Inspection report
- Process safety
- Structural safety
- ConocoPhillips
- Ekofisk J
-
Re § 16 Drainage systemssufficient capacity to drain water that gathers in the installation during precipitation and during fire-fighting, that any oily surface water is cleaned out before discharge, that the collection system
- Guideline
- Technical and operational regulations
-
Re § 36 Firewater supplythe facility's largest fire area plus the largest of the adjacent areas. A pump start-up failure does not need to be used as a basis for capacity calculations for the largest fire area plus the largest
- Guideline
- The facilities regulations
-
Lundin - Exploration Drilling - Well 7120/1-5Published:71o 56' 15.97" N 20o 14' 57.37" E The drilling location is around 185 kilometres north-west of Hammerfest. Water depth at the site is 368 metres. Drilling is scheduled to begin in late December 2016 and
- Consent
- Exploration drilling
-
Eni - Goliat - Safety instrumented systemsPublished:presentations and interviews with project coordinators at the Goliat operational organisation at Hammerfest and interviews with technical staff at Eni's head office in Stavanger. Result The audit identified
- Inspection report
- Process safety
- Eni Norge
- Goliat FPSO
-
Re § 24 Outdoor work areasaccumulation of flammable gases, hazard of increased explosion pressure and potentially reduced access for fire-fighting. With regard to new constructions and modifications, weather protection requirements should
- Guideline
- Technical and operational regulations
-
PSA investigates Mongstad incidentPublished:has launched an investigation into a fire at the Mongstad refinery on 3 July 2022. The Petroleum Safety Authority Norway (PSA) has launched an investigation into a fire at the Mongstad refinery on 3 July
- News
- Risk management
- Process safety
- Emergency preparedness
-
Statoil - Gina Krog - Barrier managementPublished:identified in connection with: Fire design loads The fire water system In addition, improvement points were identified in connection with: Risk management Barrier management system Fire divisions Partitioning
- Inspection report
- Barrier management
- Risk management
- Technical safety
- Process safety
- Statoil
- Gina Krog
-
§ 3 Definitionsinstallations. Fire area: Area, building or room that is separated from other areas by a fire division, such that the likelihood of spread in the event of a design fire load is reduced. Fire division: Distance
- Paragraph
- Technical and operational regulations
-
Equinor - Statfjord C - Follow-up of the preconditions for consent to expand the lifetimePublished:with: The fire water system Penetrations in fire walls Noise exposure Chemical health hazards In addition, improvement points were identified in connection with: Inspection of penetrations in fire walls Updating
- Inspection report
- Working environment
- Process safety
- Statoil
- Statfjord C
-
Statoil - Valemon - Barrier management - Technical safety - Electrical installationsPublished:Heating cables Fire areas Fire divisions In addition, six improvement points were identified in connection with: Explosion overpressure Ignition source control Isolation plan Passive fire protection Documentation
- Inspection report
- Electrical installations
- Technical safety
- Process safety
- Statoil
- Valemon
-
§ 20 Chemicals and chemical exposurebe considered: health and safety of personnel, corrosion and other forms of material decomposition, fire and explosion hazard, and risk for pollution. 612-1033-F2025_1-20
- Paragraph
- Technical and operational regulations
-
§ 15 Chemicals and chemical exposurebe considered: health and safety of personnel, corrosion and other forms of material decomposition, fire and explosion hazards, risk of pollution. 634-1033-F2025_1-15
- Paragraph
- The facilities regulations
-
Eni Norge - Goliat FPSO - Emergency preparednessPublished:Goliat field, located on the Tromsøflaket bank in the Barents Sea around 85 kilometres north-west of Hammerfest. The field will be developed using a floating production, storage and offloading (FPSO) vessel
- Inspection report
- Emergency preparedness
- Eni Norge
- Goliat FPSO