What are you looking for?
431 hits in Complete website
Filters
Subjects
Year
Selected filters
-
Order to ConocoPhillips – Eldfisk 2/7 B and 2/7 S – management of helideck operationsPublished:officer (2/7 B) Deficient marking of the helideck’s size (2/7 B) Insufficient capacity and coverage of fire water (2/7 B) Insufficient capacity of the drainage channel (2/7 B) Missing marking of the flare tower
- Audit report
- Emergency preparedness
- ConocoPhillips
- Eldfisk B
- Eldfisk S
-
1970s: When the NCS became NorwegianPublished:working conditions. Another incident occurred on 1 November 1975 when a riser on Ekofisk Alpha caught fire. The platform was evacuated, but three crew died because a rescue capsule fell during lowering. Turning
- Feature
- Working environment
- Process safety
-
Investing in autonomousPublished:has been developed using subsea facilities and pipelines to the onshore facility at Melkøya near Hammerfest. Following the start-up of Askeladd Vest in autumn 2025, the pipeline length has been extended
- Feature
- Artificial intelligence
-
Re § 27 Matters relating to health, safety and the environment in the Plan for Development and Operation (PDO) of petroleum deposits and the Plan for Installation and Operation (PIO) of facilities for transport and utilisation of petroleumsystems, a brief description should be provided of planned fire preparedness and protective gear at the enterprise and municipal or regional public fire preparedness. 3.Offshore petroleum activities For fourth
- Guideline
- The framework regulations
-
Ekofisk – a cradle for safety progressPublished:the NCS, and the Ekofisk area was hard hit. Occurrences there included several helicopter crashes, a fire on the Ekofisk 2/4 A platform in 1975, with three deaths during the evacuation, and the major Bravo
- Feature
- Barrier management
- Emergency preparedness
- Risk management
-
Equinor – Heimdal – investigation of work accidentPublished:occurred while filling (pressurising) a 3.4-litre nitrogen gas cylinder, which formed part of the fire extinguishing system on the platform and was to be pressurised to 200 barg using a booster pump. During
- Investigation report
- Working environment
- Process safety
- Emergency preparedness
- Heimdal
- Equinor
-
Engine fumes pose health risk offshorePublished:generators on mobile facilities a major contributor. And diesel-driven forklifts, cranes, cement units, fire pumps and emergency generators can have substantial local significance. So can permanent and temporary
- News
- Working environment
-
Re § 13 Materials handling and transport routes, access and evacuation routesevacuation routes should be designed so that there is free passage for personnel wearing smoke-diver and/or fire-fighting equipment. For mobile facilities that are not production facilities, and that are registered
- Guideline
- The facilities regulations
-
Failures and incidents involving circuit breakersPublished:in the petroleum industry. Havtil has investigated some of these incidents: Equinor/Statfjord A – fire (16.10.2016) Equinor/Kårstø – electrical incident with personal injury (25.7.2020) Equinor/Statfjord
- News
- Electrical installations
- Learning
-
Order to Equinor – Norne – technical safety, electrical systems, automation and risk managementPublished:maintenance Deficient planning and prioritisation Defective follow-up of the alarm systems Passive fire protection Deficient labelling of facilities, systems and equipment We also observed one factor that
- Audit report
- Barrier management
- Process safety
- Norne FPSO
- Equinor
-
Order to Gassco and Statoil - Kårstø - Electrical plant and Major accident riskPublished:equipment Work in and operation of electrical installations Protection against ignition and the spread of fire Emergency lighting Maintenance of explosion-proof equipment Notification of hazard and accident situations
- Audit report
- Process safety
- Technical safety
- Risk management
- Gassco
- Kårstø
- Kvitebjørn
-
Order to Saipem Drilling - Scarabeo 8Published:area (SDLA) Technical conditions The audit also detected improvement points relating to: Readiness of fire stations Lifting forum What happens now? On the basis of our observations in the audit, we have now
- Audit report
- Emergency preparedness
- Handling, cranes and lifting
- Maintenance management
- Saipem
- Scarabeo 8
-
Order to Repsol – YmePublished:Inadequate maintenance management Deficiencies in gas detection Lack of periodic testing of logic for fire and gas detectors. Deficiencies in the emergency shutdown system Inadequate documentation In addition
- Audit report
- Process safety
- Repsol
- Maersk Inspirer
-
RNNP 2020: developments on land give grounds for concernPublished:develop into a major accident was registered at the land plants in 2020. In addition to two serious fires at Melkøya and Tjeldbergodden, a worrying rise was seen in the number of unignited hydrocarbon leaks
- News
- RNNP
-
Safe use of lithium-ion batteries in the petroleum industryPublished:offshore facility is important, and efforts must be made to reduce the risk of exposure to external fires and explosions, ship collisions and falling loads. It is also important that an incident in a battery
- Project report
- Barrier management
- Process safety
-
Re § 29 Notification and reporting of hazard and accident situations to the supervisory authoritiesincidents and well integrity incidents, cf. also Offshore Norge's guideline No. 135, explosions and fires, major accidental hydrocarbon and chemical discharges of significance to safety and the working environment
- Guideline
- The management regulations
-
AI requires a holistic perspectivePublished:consists of systems which are directly connected to safety, such as emergency shutdown systems or fire/gas systems which feed directly into safety-critical applications," Husebø explains. He states that
- Feature
- Artificial intelligence
-
Behind the RNNP resultsPublished:hydrocarbon leak DSHA 2 Ignited hydrocarbon leak DSHA 3 Well incidents/loss of well control DSHA 4 Fire/explosion in other areas DSHA 5 Ship on collision course DSHA 6 Drifting object DSHA 7 Collision with
- Article
- RNNP
-
Order to Rowan – audit of electrical installations and technical safety on Rowan NorwayPublished:regulatory breaches in the following areas: internal follow-up barrier management ignition source control fire doors and passive protection lighting in the emergency hospital technical conditions with electrical
- Audit report
- Electrical installations
- Technical safety
- Rowan
- Rowan Stavanger
-
Which regulations apply?Published:overall requirements for the working environment. In addition come the Pollution Control Act, the Fire and Explosion Prevention Act and a number of statutes related to health. Click here for a complete
- Article
- Regulations