Equinor – Oseberg H – use of vessel with gangwayPublished:requirements of the Offshore Operation Manager, activation of emergency shutdown of Oseberg H, assessment of fire on the gangway-equipped vessel and competency requirements of gangway operators. What happens now
- Audit report
- Working environment
- Emergency preparedness
- Process safety
- Structural safety
- Oseberg H
- Equinor
-
Vår Energi – Major accident risk and barriers – BalderPublished:Barrier strategy and performance standards Management of change Process safety Ignition source control Fire resistance Temporary equipment and installations Labelling Maintenance programme Documentation Deck
- Audit report
- Barrier management
- Risk management
- Balder
- Vår Energi
-
Eni Norge - Goliat - Electrical installationsPublished:identified in connection with: Gas detectors of HVAC intakes and ducts Organisation of electrical staff Fire detectors and manual activation of electrical isolation Test method for heating cables Personnel responsible
- Audit report
- Electrical installations
- Process safety
- Eni Norge
- Goliat FPSO
-
Odfjell – Deepsea Atlantic – risk management, electrical facilities and safety instrumented systemsPublished:management Handling of non-conformities Ignition source control Ventilation system Firefighting Passive fire protection Open drainage Emergency lighting Lithium ion battery system Electrical facilities and installations
- Audit report
- Process safety
- Risk management
- Electrical installations
- Technical safety
- Deepsea Atlantic
- Odfjell Drilling AS
-
Piper Alpha at 35 – still highly significantPublished:NTBScanpix/PA Photos The major accident of 6 July 1988, when Britain’s Piper Alpha facility caught fire and exploded, remains one of the worst imaginable scenarios for everyone working in and with the petroleum
- Feature
- Barrier management
- Process safety
- Risk management
-
Positive inheritancePublished:Statfjord A, fire (5) 1978: Statfjord A, helicopter crash (18) 1980: Alexander L Kielland, wreck (123) 1983: Byford Dolphin, diver accident (5) 1988: Piper Alpha (UK), gas blowout and fire (167) 1991: Ekofisk
- Feature
- Barrier management
- Emergency preparedness
- Structural safety
- Process safety
-
Statoil - Heimdal - Investigation of a hydrocarbon leakPublished:expertise and risk understanding. Potential In addition, inadequate capacity in the fire water system and in the fire wall between the production and drilling areas was identified. These conclusions are
- Investigation report
- Emergency preparedness
- Working environment
- Process safety
- Statoil
- Heimdal
-
BP - Ula - Investigation of hydrocarbon leakPublished:BP’s management system for activities on the NCS. Following the PSA’s earlier investigation of the fire on the Valhall PCP installation in 2011, operator BP was served with orders which included a review
- Investigation report
- Working environment
- Technical safety
- Process safety
- Structural safety
- Emergency preparedness
- BP
- Ula PP
-
Statoil - Statfjord C - Investigation of hydrocarbon leakPublished:started up. The valve controlling the level in the oily water tank failed to open, and oil escaped via fire seals on the cellar deck. Consequences Statoil calculated that up to 42 cubic metres of stabilised
- Investigation report
- Working environment
- Emergency preparedness
- Technical safety
- Maintenance management
- Statfjord C
- Statoil
-
Order for Rowan – Rowan Viking – electrical facilities, safety instrumented systems, technical safety and drilling-related systemsPublished:Non-conformity handling, manning and competence Ignition source control Overpressure protection Passive fire protection Firefighting Emergency power facility Emergency lighting Risk assessment of evacuation
- Audit report
- Electrical installations
- Technical safety
- Well integrity
- Rowan
- Rowan Viking
-
Equinor – Troll C – investigation of incident with gas cooler cracksPublished:(seawater). The outer shell has a specified thickness of 36 millimetres. The coolers are protected by fire insulation on tank and flanges. Technical material investigations have concluded that the cracks were
- Investigation report
- Structural safety
- Process safety
- Maintenance management
- Equinor
- Troll C
-
RNNP and major accident riskPublished:substantial harm to people, the environment and material assets. Fire/explosion in other areas: An example of such incidents is a fire in the living quarters with the potential to develop into a major
- Article
-
Vår Energi – Ringhorne – emergency preparedness and helideck operationsPublished:addition, four improvement points were identified, concerning: Marking of escape route Equipment in fire stations Obstructions outside the 210° obstacle-free approach and take-off sector Obstacle lights
- Audit report
- Emergency preparedness
- Emergency preparedness/emergency response
- Vår Energi
- Ringhorne
-
How can risk be managed?Published:as the supervisory authority. Such events are defined as an acute incident, like a major spill, a fire or an explosion, which immediately or subsequently causes a number of fatalities and/or serious personal
- Article
-
AoC audit – Noble Drilling – Noble Lloyd Noble – emergency preparedness, helideck and drinking waterPublished:drills Marking and signage of escape routes Life jacket design and location Immersion suits MOB suits Fire stations Marking of lifeboats Marking of FRC/MOB Maintenance of the drinking water system Piping and
- Audit report
- Emergency preparedness
- Shelf Drilling Barsk
- Noble Drilling
-
Equinor – Martin Linge – completion and preparation for operationPublished:improvement points included: High failure rate of emergency lights Fault in self-closing doors in fire divisions What happens now? We have asked Equinor to report by 27 August 2021 on how the non-conformities
- Audit report
- Process safety
- Technical safety
- Electrical installations
- Martin Linge
- Equinor
-
Songa Offshore - Songa Dee - Electrical plant and the roles responsibilities and duties of the personnel responsible for thisPublished:lighting Electrical plant – technical conditions Performance of modifications Frost protection of fire mains Improvement points were identified in connection with: Maintenance management Emergency shutdown
- Audit report
- Process safety
- Songa
- Songa Deee
-
AoC audit - AKOFS - AKOFS Seafarer - Electrical facilities, technical safety and maintenance managementPublished:Project execution and completion Barrier management Ignition source control Emergency lighting Passive fire protection Electrotechnical system analyses Work on and operation of electrical installations Training
- Audit report
- Electrical installations
- Process safety
- Maintenance management
- AKOFS Seafarer
-
Equinor – Snorre B – Flexible risers and associated safety systemPublished:non-conformities were identified, relating to: Assessment of the consequences of the worst credible process fire Planning and prioritisation of observations in the TIMP tool Operation of flexible risers Systematic
- Audit report
- Structural safety
- Process safety
- Equinor
- Snorre B
-
Equinor – Troll B – Technical safety, process safety and electrical facilitiesPublished:Deficiencies in operating and control equipment for motors and other consumers Deficiencies in passive fire protection of hydrocarbon-carrying equipment Inadequate illumination in emergency hospital Deficiencies
- Audit report
- Process safety
- Technical safety
- Electrical installations
- Troll B
- Equinor