The audit was conducted from 11 to 15 March 2024.

Objective

The objective of the audit was to verify how Gassco handles SIL in operations, with a focus on safety systems, and the company’s follow-up of performance requirements, so that the safety level is maintained and improvement measures are implemented where necessary.

Result

The audit identified non-conformities concerning the following:

  • Classification of safety-critical equipment – gas detectors
  • Knowledge of weaknesses in safety-critical equipment – emergency shut-off valves for the pipelines

We also observed three factors that we have chosen to categorise as improvement points. These concerned:

  • Collection, processing and use of data
  • Relationship between assumptions made and results achieved
  • Securing the performance of safety functions

What happens now?

We have asked Gassco to report to us by 24 May 2024 on how the non-conformities will be addressed, and to give us their assessment of the improvement points observed.