The audit was conducted from 8 to 16 March 2023.
Objective
The objective of the audit was to investigate how Vår Energi follows up corrosion in process systems and falling structures/auxiliary structures on the Balder FPU, and ensures compliance with the requirements in its own documents and the regulations.
Result
No non-conformities were identified.
Three improvement points were identified, concerning:
- Follow-up of grating and connections with different materials
- Follow-up of standards referenced in the regulations
- Capacity of safety valves on inlet separator
What happens next?
We have asked Vår Energi to give us their assessment of the improvement points observed by 2 June 2023.