Operator: Wintershall Dea

Field: Nova

Facility: Scarabeo 8

Other information: The consent covers drilling and completion of two injection wells and three production wells.

Nova

Nova is a field in the northern part of the North Sea, 17 kilometres southwest of Gjøa field. The water depth in the area is 370 m. Nova was proven in 2012, and the plan for development and operation (PDO) was approved in September 2018. The planned development consists of two 4-slots subsea templates, one for oil production and one for water injection, each with three wells tied-back to the Gjøa platform. 

Production started in 2022. 

Source: norskpetroleum.no