What are you looking for?
1675 hits in Audits and investigation reports
Filters
Subjects
Type
Operator
Facility
Year
-
Equinor – Gullfaks A – integrity and barrier management for risers and flexible pipelines, corrosion under insulationPublished:
- Inspection report
- Structural safety
- Equinor
- Gullfaks A
-
Equinor – Oseberg Øst - storulykkerisiko, barrierer og beredskapPublished:
- Inspection report
- Barrierestyring
- Beredskap
- Equinor
- Oseberg Øst
-
Order to COSL Drilling – COSLPromoter – management of the working environment and operations in the drilling areasPublished:
- Inspection report
- Working environment
- COSL Drilling Europe
- COSL Promoter
-
Equinor – Hammerfest LNG – follow-up of previous audits and investigationsPublished:
- Inspection report
- Risk management
- Process safety
- Equinor
- Melkøya
-
Equinor – Gullfaks C – materials handling and logisticsPublished:
- Inspection report
- Handling, cranes and lifting
- Equinor
- Gullfaks C
-
Equinor – Troll A – emergency preparednessPublished:
- Inspection report
- Emergency preparedness
- Equinor
- Troll A
-
Aker BP – Hugin – design and fabrication of jacketPublished:
- Inspection report
- Structural safety
- Aker BP
-
Equinor – Åsgard B – logistics and emergency preparednessPublished:
- Inspection report
- Emergency preparedness
- Equinor
- Åsgard B
-
Equinor – Mongstad – surface programme, ageing and major accident auditPublished:
- Inspection report
- Structural safety
- Risk management
- Equinor
- Mongstad
-
Aker BP - Ula - safety systems and follow-up of SIL in operationsPublished:
- Inspection report
- Process safety
- Ula DP
- Aker BP
-
ConocoPhillips – load-bearing structuresPublished:
- Inspection report
- Structural safety
- Risk management
- ConocoPhillips
-
Equinor – Johan Sverdrup – temporary hiresPublished:
- Inspection report
- Working environment
- Equinor
- Johan Sverdrup
-
Seadrill – West Elara – maintenance managementPublished:
- Inspection report
- Maintenance management
- West Elara
- Seadrill
-
Equinor – Heidrun – safety systems in operationsPublished:
- Inspection report
- Process safety
- Risk management
- Equinor
- Heidrun
- Statfjord B
-
Equinor – working environment riskPublished:
- Inspection report
- Working environment
- Equinor
-
Vår Energi – Ringhorne – managed pressure drilling (MPD)Published:
- Inspection report
- Well integrity
- Ringhorne
-
AKOFS – AKOF Seafarer – updating of AoC – electrical facilities and technical safetyPublished:
- Inspection report
- Electrical installations
- AKOFS Seafarer
-
Equinor – Veslefrikk – disposal of facilitiesPublished:
- Inspection report
- Veslefrikk A
- Veslefrikk B
- Equinor
-
Equinor – Sleipner A – investigation of incident with short circuit and fire pump breakdownPublished:
- Investigation report
- Emergency preparedness
- Process safety
- Technical safety
- Sleipner
- Equinor
-
Repsol – Yme – maintenance managementPublished:
- Inspection report
- Maintenance management
- Repsol
- Yme
- Maersk Inspirer